---
title: "Complete Bathroom Renovation in Munich | Remus Bumb"
description: "A complete bathroom renovation in Munich, taken back to bare walls and rebuilt from one hand with new pipework, a level-access walk-in shower and a tiled-in bath."
url: https://www.remus-dienstleistungen.de/en/projects/bathroom-renovation-munich
---

[Home](/en) › [Projects](/en/projects) › Bathroom Renovation 

# Complete Bathroom Renovation in Munich

Full strip-out to a finished walk-in shower and tiled-in bath

Location **Munich** 

Completed **2026** 

Service **Bathroom Renovation** 

Scope **Strip-out, walk-in shower, tiled bath** 

## The Brief

The owners of a Munich home had a dated, tired bathroom that no longer suited the way they live. They wanted a complete renovation: a modern, open feel, a generous level-access walk-in shower, and a proper bath, all finished in warm, hard-wearing stone tiling. The job needed to be handled from one hand, from the first plan through to the last tile. 

## What We Did

The work included:

* **Full strip-out:** The old bathroom was taken back to bare walls and floor, with the existing fixtures and pipework carefully removed.
* **New pipework:** Fresh supply and waste runs were set out and pressure-tested before anything was closed in, so the bathroom stays dry for the long term.
* **Level-access walk-in shower:** The wet area was tanked and waterproofed, with a linear drain set dead level and a built-in niche and bench formed in the tiling.
* **Tiled-in bath:** A bath was framed and tiled in to match the room, with a wall-mounted mixer.
* **Stone tiling throughout:** Large-format stone-look tiles were laid on the walls and floor with consistent, straight joints and clean cuts around every fixture.
* **Final fit-out:** Shower fittings, taps and finishing details were installed and tested before handover.

## The Result

A bright, modern bathroom that feels far larger than before, with a walk-in shower and a tiled-in bath set against warm stone tiling. Everything was carried out by one tradesman, so the pipework, waterproofing, tiling and fit-out all line up to a single high standard. 

**Job duration:** Around two weeks from strip-out to final handover. 

## Gallery

![Bathroom stripped back to bare walls before renovation in Munich](/pictures/projects/bathroom-munich/before-01.webp) 

![Finished bathroom with walk-in shower and tiled bath in Munich](/pictures/projects/bathroom-munich/after-01.webp) 

![Matte-black rainfall walk-in shower after renovation](/pictures/projects/bathroom-munich/after-02.webp) 

![Finished vanity and fixtures in the renovated bathroom](/pictures/projects/bathroom-munich/after-03.webp) 

× 

❮ ❯ 

1 / 1 

## Planning a Bathroom Renovation?

Call or message Remus on +49 15510 75 57 76 for a free quote across Munich.

[Get a Free Quote](/en/form)
